In this graphic:
“Inventory” was measured as pallets on hand at the end of each month.
“Productivity” was calculated as lines shipped per person per hour. This was the gross productivity measurement for the DC calculated by “all of the work” divided by “all of the labor” (including temporary and overtime). Productivity was expressed using this metric since all of the work supporting manufacturing, receiving, putaway, etc., was needed prior to shipping a customer order. This is also why the lines shipped per hour was in the low single digits; there were many tasks done by distribution personnel in this operation that are uncommon to many distribution centers.
In this specific example, it is clear that as inventory increased during the period, productivity declined, and at an accelerated rate. While inventory increased by 7% at the peak in an already crowded warehouse, productivity declined much faster, by 26%.
Kimball says that when it gets to the point that pallets are being staged in aisles, it is common that a lift truck operator might have to move as many as three pallets to get to the one that is needed. Then, the operator has to set down the needed pallet and move the three pallets back before picking up the needed pallet again. Instead of one touch to get the pallet, there are as many as seven touches, and the aisle is blocked to other lift trucks as this is happening.
On the other hand, when there is still ample storage space available at peak inventory, the productivity should not decline, at least not due to space getting tighter.
While recognizing that every facility is different, and the dynamic nature of distribution has an ever-changing mix of variables, the premise is clear that if a facility lacks sufficient space for peak needs and inventory grows, productivity will decline.
This then begs an interesting question: when, if ever, is it more cost effective to utilize outside storage to reduce over-capacity and increase productivity?
Companies that keep track of the relationship between storage utilization and productivity rates should be able to not only show management what the true costs of stuffing the DC with pallets are, but also how the DC additional costs might be balanced against outside storage costs.
Do you track space utilization versus DC productivity? At what level do you start to see productivity start to be negatively impacted? How do you determine when outside storage makes economic sense? Let us know your thoughts at the Feedback button below.
|